Reminder: Remember to maintain the walk-in high and low temperature (humid and hot) laboratory as well!
1. The temperature and humidity testing system of the walk-in high and low temperature (humid and hot) laboratory must be operated and maintained by a dedicated person. Strictly follow the operating procedures of the system and avoid others from operating the system illegally.
2. Long term shutdown of the walk-in high and low temperature (humid and hot) laboratory can affect the effective service life of the system. Therefore, the system should be turned on and operated at least once every 10 days; Do not repeatedly stop the system in a short period of time. The number of starts per hour should be less than 5 times, and the time interval between each start stop should not be less than 3 times; Do not open the door of the walk-in temperature and humidity testing system at low temperatures to prevent damage to the door sealing tape.
3. A system usage file should be established to facilitate system maintenance and repair. The use of archives should record the start and end time (date) of each system operation, the type of experiment, and the ambient temperature; When the system malfunctions, provide a detailed description of the fault phenomenon as much as possible; The maintenance and repair of the system should also be recorded in as much detail as possible.
4. Conduct a monthly main power switch (leakage circuit breaker) operation test to ensure that the switch is used as a leakage protector while meeting the load capacity. The specific steps are as follows: first, please confirm that the main power switch is turned to "ON", which means the system is powered on, and then press the test button. If the switch lever of the residual current circuit breaker falls down, this function is normal.
5. The main box of the walk-in temperature and humidity testing system should be protected during use and should not be subjected to strong impacts from sharp or blunt objects.
6. To ensure the normal and clean supply of cooling water, the cooling water filter of the refrigeration unit should be cleaned every 30 days. If the local air quality is poor and the dust content in the air is high, the cooling water tower reservoir should generally be cleaned every 7 days.
7. The leakage, overload, and short-circuit protection characteristics of the residual current switch are set by Lab Companion manufacturer and cannot be adjusted arbitrarily during use to avoid affecting performance; After the leakage switch is disconnected due to a short circuit, the contacts need to be checked. If the main contacts are severely burned or have pits, maintenance is required.
8. The test products placed in the walk-in temperature and humidity testing system should be kept at a certain distance from the suction and exhaust ports of the air conditioning channel to avoid obstructing air circulation.
9. Overtemperature protector action test. Set the temperature of the over temperature protector to be lower than the temperature of the box. If there is an E0.0 alarm and buzzing sound, it indicates that its function is normal. After completing the above experiment, the temperature protection setting should be reset appropriately, otherwise it may cause inappropriate termination.
10. Once a year, use a vacuum cleaner to clean and remove dust from the distribution room and water circuit room. Once a month, use a dry cloth to clean the accumulated water in the water tray of the refrigeration unit.